01
Pool & spa structure
Excavation, steel, gunite, plumbing and grading.
Excavation and dirt removal
Excavation of the pool and spa shell (160 lf of perimeter) and haul-off of all the dirt.
See details
Pool Excavation & Dirt Removal · 160 Linear Feet × $48.75
- Pool shell excavation and haul-off/removal of excavated dirt from the job site. Priced per linear foot.
Rebar and forms
Forms and engineered steel grid for floor, walls, steps, benches and beam (160 lf), bonded per NEC 680 and inspected before gunite.
See details
Rebar & Forms · 160 Linear Feet × $50
- Steel reinforcement and forming for the pool/spa shell, installed to the structural engineer's plans and Florida Building Code.
- Layout and setting of forms around the pool perimeter to establish the shell shape and beam
- Supply and installation of steel rebar per engineered spacing and size, tied in a grid across the floor, walls, steps, benches and beam
- Rebar supports/chairs to hold proper clearance for the gunite
- Bonding of the steel per NEC 680 requirements (bonding inspection coordinated per permit)
- Steel inspection coordinated before gunite
Gunite shell
Gunite shell for the pool and spa (160 lf), built to the structural engineer's plans and the Florida Building Code.
See details
Gunite · 160 Linear Feet × $200
- Gunite (shotcrete) application for the pool/spa shell, built to the structural engineer's plans and Florida Building Code.
Perimeter piping and rough plumbing
Main drain, skimmer, return and suction lines to the equipment pad, pressure tested twice and inspected.
See details
Perimeter Piping & Rough Plumbing · 1 Each × $6,200
- Stage 1, before gunite: main drain lines installed and pressure tested.
- Stage 2, after gunite and first backfill: trenching to the equipment pad, PVC piping for skimmers, returns and suction lines
- Rough-in for spa, water features and cleaner lines per the plans
- Second pressure test of the perimeter piping
- Perimeter piping, underground electrical and pressure test inspection coordinated per permit
Backfill and grading to deck level
Two-stage backfill in compacted lifts and grading to deck level, sloped away from the pool and the house.
See details
Backfill & Grading To Deck Level · 1 Each × $3,200
- First backfill around the shell after gunite and form removal
- Second backfill in compacted lifts after the piping inspection
- Grading to deck sub-grade with slope away from the pool and house
- Final leveling and cleanup of excess material